油气回收设备:加油站项目竣工环保验收,应注意哪些内容?
已经办理环评手续的加油站,项目竣工环保验收时需要注意哪些内容呢?小编已整理相关资料,以供参考~
What should be noted during the environmental protection acceptance of gas stations that have already completed environmental impact assessment procedures? The editor has compiled relevant materials for reference~
01验收重点
01 Key acceptance points
一次油气回收 是通过压力平衡原理,将油罐车在卸油过程中挥发的油气重新收集到油罐车内,并运回油库,进行油气回收处理。
A single oil and gas recovery is achieved through the principle of pressure balance, which collects the evaporated oil and gas from the oil tank truck during the unloading process and transports it back to the oil depot for oil and gas recovery treatment.
二次油气回收 是通过加油枪真空辅助式设备,将加油过程中挥发的油气通过油气回收管线收集到地下储油罐
Secondary oil and gas recovery is achieved through a vacuum assisted device with a refueling gun, which collects the evaporated oil and gas during the refueling process through an oil and gas recovery pipeline and sends it to an underground storage tank
三次油气回收 是将加油站地下储油罐内由于压力过大而排放的油气,通过冷凝、膜分离等方法,进行回收处理。
Triple oil and gas recovery is the process of recovering and treating the oil and gas discharged from underground storage tanks at gas stations due to excessive pressure through methods such as condensation and membrane separation.
油气回收装置安装情况《中华人民共和国大气污染防治法》第四十七条明确规定,加油站应当按照国家有关规定安装油气回收装置并保持正常使用。那什么是油气回收装置呢?油气回收装置包括卸油油气回收系统(一次油气回收)、加油油气回收系统(二次油气回收)以及三次油气回收装置(三次油气回收)。油气回收系统油气回收在线监测设备根据《上海市生态环境局、市经济和信息化委、市交通委关于进一步加强本市油气回收治理工作的通知》(沪环气〔2019〕234号),年销售汽油量≥2000吨的加油站应安装油气回收在线监控设备,与生态环境部门联网(上海市内加油站均应与上海市生态环境局联网)。
According to Article 47 of the Air Pollution Prevention and Control Law of the People's Republic of China, gas stations shall install oil and gas recovery devices in accordance with relevant national regulations and maintain normal use. What is an oil and gas recovery device? The oil and gas recovery device includes an unloading oil and gas recovery system (primary oil and gas recovery), a refueling oil and gas recovery system (secondary oil and gas recovery), and a tertiary oil and gas recovery device (tertiary oil and gas recovery). According to the "Notice on Further Strengthening the Management of Oil and Gas Recovery in Shanghai" (Hu Huan Qi [2019] No. 234) issued by the Shanghai Ecology and Environment Bureau, Municipal Economic and Information Commission, and Municipal Transportation Commission, oil and gas recovery online monitoring equipment should be installed at refueling stations with an annual sales volume of ≥ 2000 tons of gasoline, and connected to the ecological environment department (all gas stations in Shanghai should be connected to the Shanghai Ecology and Environment Bureau).
验收监测关于工况验收监测应当在确保主体工程调试工况稳定、环境保护设施运行正常的情况下进行,并如实记录监测时的实际工况。建议在验收监测期间保持正常的工况。若国家和地方有关污染物排放标准或者行业验收技术规范对工况和生产负荷另有规定的,按其规定执行。关于验收监测内容主要监测项目包括:油气回收系统(液阻、密闭性、气液比、密闭点位泄漏检测值、处理装置排放浓度、在线监测系统校准和数据比对)、厂界废气、厂区内废气、厂界噪声,以及其他环评及审批部门要求的监测内容。加油站废气通常为油气,一般采用非甲烷总烃作为油气排放控制项目。关于监测频次油气回收系统监测项目:
Acceptance monitoring of working conditions should be carried out under the condition of ensuring stable commissioning conditions of the main project and normal operation of environmental protection facilities, and the actual working conditions during monitoring should be truthfully recorded. It is recommended to maintain normal operating conditions during the acceptance monitoring period. If the national and local pollutant emission standards or industry acceptance technical specifications have other provisions on working conditions and production loads, they shall be implemented in accordance with their provisions. The main monitoring items for acceptance monitoring include: oil and gas recovery system (liquid resistance, airtightness, gas-liquid ratio, leakage detection values at sealed points, treatment device emission concentration, online monitoring system calibration and data comparison), factory boundary exhaust gas, factory internal exhaust gas, factory boundary noise, and other monitoring contents required by environmental impact assessment and approval departments. Gas station exhaust gas is usually oil and gas, and non methane total hydrocarbons are generally used as oil and gas emission control projects. Regarding the monitoring frequency of oil and gas recovery system monitoring projects:
废气:一般不少于2天、每天采不少于3个平行样废水:一般不少于2天,每天不少于4次厂界噪声:一般不少于2天,每天昼夜各不少于1次(如果夜间无作业无工况,无需开展监测)。02验收注意事项
Waste gas: generally not less than 2 days, no less than 3 parallel samples per day. Wastewater: generally not less than 2 days, no less than 4 times per day. Factory boundary noise: generally not less than 2 days, no less than 1 time per day and night (if there is no operation or working condition at night, no monitoring is required). 02 Acceptance precautions
验收流程
Acceptance Process
1
one
2这些节点需要注意:1若项目涉及变动,判断是否属于重大变动,具体判定见取得环评审批意见后,项目变动了,我该怎么办?2应在调试期前取得排污许可证或排污登记回执。3进入调试期后,方能开展验收监测。
2. These nodes need to be noted: 1. If the project involves changes, determine whether it is a significant change. The specific determination can be found after obtaining the environmental impact assessment approval opinion. What should I do if the project changes? 2. The pollutant discharge permit or pollutant discharge registration receipt should be obtained before the commissioning period. Only after entering the debugging period can acceptance monitoring be carried out.
4根据《企业事业单位突发环境事件应急预案备案管理办法(试行)》第十七条“建设单位制定的环境应急预案或者修订的企业环境应急预案,应当在建设项目投入生产或者使用前,按照本办法第十五条的要求,向建设项目所在地受理部门备案。”根据《上海市实施<企业事业单位突发环境事件应急预案备案管理办法(试行)>的若干规定》第十八条”建设单位应在建设项目竣工验收前完成备案工作。”5验收报告编制完成后,需在5个工作日内在“上海企事业单位环境信息公开平台”公示不少于20个工作日。平台网址:https://e2.sthj.sh.gov.cn:8081/jsp/view/hjxxgk/jsxmhp_index.jsp上海市平台公示满20个工作日后,需在5个工作日内在“全国建设项目竣工环境保护验收信息系统”公示。系统网址:http://114.251.10.205/#/pub-message
According to Article 17 of the "Measures for the Administration of Filing of Emergency Plans for Sudden Environmental Incidents in Enterprises and Institutions (Trial)", "The environmental emergency plan formulated or revised by the construction unit shall be filed with the local acceptance department of the construction project in accordance with the requirements of Article 15 of these Measures before the construction project is put into production or use." According to Article 18 of the "Measures for the Administration of Filing of Emergency Plans for Sudden Environmental Incidents in Enterprises and Institutions (Trial) in Shanghai", "the construction unit shall complete the filing work before the completion and acceptance of the construction project. ”After the completion of the 5 acceptance reports, they must be publicly displayed on the "Shanghai Enterprise and Institution Environmental Information Disclosure Platform" for no less than 20 working days within 5 working days. Platform URL: https://e2.sthj.sh.gov.cn:8081/jsp/view/hjxxgk/jsxmhp_index.jsp After 20 working days of public announcement on the Shanghai platform, it is required to make a public announcement on the "National Construction Project Completion Environmental Protection Acceptance Information System" within 5 working days. System URL: http://114.251.10.205/#/pub -message
验收期限
Acceptance deadline
验收期限是指自建设项目环境保护设施竣工之日起至建设单位向社会公开验收报告之日止的时间。除需要取得排污许可证的水和大气污染防治设施外,其他环境保护设施的验收期限一般不超过3个月;需要对该类环境保护设施进行调试或者整改的,验收期限可以适当延期,但最长不超过 12 个月。
The acceptance period refers to the time from the completion of the environmental protection facilities of the construction project to the date when the construction unit publicly releases the acceptance report to the society. Except for water and air pollution prevention and control facilities that require a pollutant discharge permit, the acceptance period for other environmental protection facilities generally does not exceed 3 months; If it is necessary to debug or rectify such environmental protection facilities, the acceptance period can be appropriately extended, but not exceeding 12 months.
本文由 油气回收设备 友情奉献.更多有关的知识请点击 http://www.kosman.com.cn/ 真诚的态度.为您提供为全面的服务.更多有关的知识我们将会陆续向大家奉献.敬请期待.
This article is a friendly contribution from oil and gas recovery equipment For more related knowledge, please click http://www.kosman.com.cn/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.